By ROKA Studio

A worktop that's just been cast, or a repair that's just gone in, almost always looks a shade or two darker and duller than it will end up. That's not a fault. It's water, and it needs about a week to finish making its point.
Why does concrete look darker wet than dry?
Fresh concrete's surface is full of tiny pores. Wet, those pores hold water, and water bends light almost the same amount as the cement paste around it, so very little scatters back at you — the surface reads rich and dark, the way a wet pebble looks better than a dry one. As the water leaves and air takes its place, those pores start scattering light instead of letting it through, and the surface lightens and turns slightly hazy. That's the real colour, not the wet one.
How long before we're looking at the true colour?
We cover every piece straight after casting so the surface doesn't dry faster than the core underneath — that's what drives curling and hairline cracks, not letting it cure too slowly. It comes out of the mould at about a day old, gets loosely wrapped for another day so the drying stays gradual, then stands uncovered — on edge, so air reaches both faces — for the best part of a week before we'll hone or polish it. No draughts, no direct sun, no cold floor. Even finished, it's not sealed yet: we don't judge the true colour until about 28 days in, once it's sealed. Comparing a three-day-old piece, or even a freshly finished one, to a sealed sample tells you nothing — the colour hasn't settled.
Does sealing do the same thing, permanently?
Yes, in effect. A dry, unsealed surface is still microporous, just with air in the pores instead of water. Sealer does what water was doing temporarily — it fills those pores with a resin whose refractive index sits much closer to the cement paste's than air does, so light gets through to the pigment instead of bouncing off the surface. That's why a sealed piece reads a shade or two deeper than the same piece unsealed, and why we always match and sell colour off a sealed sample, never a raw one. Full detail on sealing is on our worktop care page.
Why this catches people out
Pick a colour off something wet, or off a piece fresh out of the mould, and you're choosing a colour you won't actually get once it's dry and finished. The same goes for judging a repair the day it goes in — it will look wrong for a few days by design, not by mistake. Give it the same week any fresh concrete needs, then compare it dry, and sealed if the surrounding worktop is sealed, before deciding whether it matches.
See the colours and finishes for yourself.
Order free samples